GUD 5.5 weeks from research to final design: an online store redesign for a backpack brand

Updated

Year:
2026
Result:
Redesign
Simpler navigation
GUD case cover with the project overview
GUD's new homepage
GUD About and corporate pages
GUD site structure
GUD UI kit
Filters, catalogue and product on phones
GUD project timeline
GUD type and colours
A GUD bag
GUD wireframes
GUD registration
GUD mobile menu
GUD desktop pages
GUD brand and product
GUD stories
“Figmatica delivered a powerful redesign of our store that perfectly captures the brand's bold, sporty, and masculine character. The new website feels modern, reliable, and provides comfortable and enjoyable shopping experience.”
Igor Gud
Director and co-founder, GUD

Frequently asked questions

Common questions about this topic

How long does an online store redesign take?

For GUD the design took 5.5 weeks: a week of research, a week of UX, a week and a half of wireframes and two weeks of UI. Development comes after that, and its length depends on the platform and on how many products and pages the store has.

How do you simplify navigation in an online store?

Start from the structure rather than the screens. For GUD the main screen leads to six sections: the store, bestsellers, bags, backpacks, accessories and the Utility Line, and each of them to the catalogue, the product and the cart. On a phone, sorting and filters sit right above the list.

How do you keep a brand's character in a store redesign?

Limit the means and use them consistently. GUD's store has one accent colour, the brand's yellow, and two typefaces: DIN Pro for headings and buttons and Aeroport Mono for text and labels. Everything else is black, white and the product.

Related work

More projects with the same kind of problem.

Mykhailo Yemchura

30 min intro call

With Mykhailo Yemchura, founder and CEO

4.9 on Clutch, 27 reviews50+ products shipped

Pick a time

No free times this month. Try the next one.